Green buildings, commercial, industrial & conservation
Green Mark and green leases, commercial strata, uses and lease terms, the FTIC retail leasing Code, B1/B2 and JTC rules, and conservation areas, uses, works and penalties.
14 sections · 8 numbers · about 24 min
Figures checked against official sources
RuleMarket practiceThe POV pointsPlain lines are rules; market practice is tagged; study tips sit in the dark card.
Watch: Green, commercial & conservation in 100 seconds
1:40Each non-residential property type comes with its own rules that decide who can use it and for what. Green buildings are rated under Green Mark and may be let on green leases. Shops and offices must be used and marketed for their approved use, and retail leases follow the mandatory FTIC Code. Industrial space must stay mainly industrial, and JTC controls subletting and sales. Conserved buildings need URA's permission for any works or new use.
Numbers to know
- Green80-80-80the green building targets for 2030
- 60 %energy improvement over 2005 for Super Low Energy (Platinum 55%)
- Retail leases14 daysto file a joint declaration of deviation with FTIC
- 3 monthsgross rent: the retail deposit cap (up to 5,000 sq ft, 3-year lease)
- Industrial60:40industrial to ancillary space, also inside each strata unit
- 30 %of GFA a JTC lessee may sublet to unrelated parties
- Conservation3RRetention, Restoration, Repair: URA's conservation principle
- $500,000maximum fine for demolishing a conserved building
Green buildings and BCA Green Mark
- What Green Mark is: BCA's Green Mark scheme, started in 2005, rates how environmentally sustainable a new or existing building is, with energy performance at its core. It encourages owners and developers to build and run greener buildings and is the benchmark used in Singapore's green building targets.
- Ratings: Green Mark 2021 (launched September 2021) awards Gold, GoldPLUS and Platinum ratings, plus energy badges such as Super Low Energy, Zero Energy and Positive Energy.
- 80-80-80 in 2030: The Singapore Green Building Masterplan targets: 80% of buildings by GFA green by 2030; 80% of new developments by GFA Super Low Energy from 2030; 80% better energy efficiency for best-in-class green buildings compared with 2005.
- What is compulsory: Minimum energy standards have applied to new buildings since 2008 and to existing buildings undergoing major retrofits since 2013. Cooling systems get Periodic Energy Audits every 3 years. Since September 2025 the Mandatory Energy Improvement regime makes energy-intensive buildings of 5,000 sqm GFA and above carry out audits and improvements.
- Incentive: The Built Environment Transformation GFA Incentive Scheme (from 24 Nov 2021, for five years) gives extra GFA above the Master Plan plot ratio to projects that meet at least GM Platinum SLE, among other requirements.
- What it rates
- Green Mark: environmental performance, energy at its core
- CONQUAS: workmanship, from a sample of the project
- Quality Mark: workmanship of every unit, plus water tests
- For
- Green Mark: new and existing buildings
- CONQUAS: new buildings
- Quality Mark: new private homes
- Result
- Green Mark: Gold, GoldPLUS or Platinum, plus energy badges
- CONQUAS: a project score and band
- Quality Mark: a certificate listing the units that pass
- Selling point
- Green Mark: lower energy use, run to a recognised standard
- CONQUAS: the developer's track record
- Quality Mark: assurance on the unit at handover
None of them covers design, and none replaces the defects liability period. Quote the actual result; do not overstate it.
- Market practice Selling the benefit: For buyers and tenants a Green Mark building means lower energy use and a building run to a recognised standard. Quote the actual rating and its date, and do not claim savings you cannot support with figures.
- See also: How CONQUAS and Quality Mark are scored: CONQUAS and Quality Mark.
Common traps
| Mistake | What’s actually true |
|---|---|
| Religious use in B2Religious use is allowed in any industrial building, with conditions. | Never allowed in B2 or business parks; only B1. |
| Dual-use officesAn office can be marketed as an office-cum-residence. | An office cannot be marketed as office-cum-residence. |
| 60:40 at building level onlyAs long as the whole building is 60% industrial, one strata owner can make his unit all office. | The 60:40 split also applies inside each strata unit. |
| Small works on conserved buildingsSmall repairs or a new awning on a conserved building need no permission. | Even Category 3 works such as a retractable awning need Conservation Permission first, though it is free. |
| JTC saleA whole-lot JTC property can be sold to any buyer the owner chooses. | A whole-lot JTC sale is conditional on JTC approving the buyer and its activity. |
| Green leases are compulsoryEvery lease of a Green Mark building must be a green lease. | Green leases are voluntary in Singapore. |
| Retail Code scopeThe retail Code covers every commercial lease, including offices. | It covers qualifying retail leases of 1 year or more, for premises selling goods or supplying services. |
| Childcare needs no approval anywhereA childcare centre can open in any shophouse without planning permission. | The no-permission route covers commercial buildings and some other premises, not shophouses, and only under 50% of GFA. |
| Shophouse buyersForeigners can buy any shophouse without approval. | Only a shophouse for commercial use; one for non-commercial use is restricted. |
Green leases
- Definition: A green lease is a lease in which landlord and tenant agree environmental objectives for how the premises are fitted out, run and used. BCA publishes a Green Lease Toolkit as part of Green Mark 2021. Green leases are voluntary in Singapore, and clauses range from aspirations to binding duties.
What do landlord and tenant agree to?
- Energy, water, waste
- Sub-metering — energy and water
- Efficient fit-out — lighting, fittings
- Renewable energy
- Recycling — space and bins
- Sharing use data
- Energy, water and waste figures — both ways
- Materials and upkeep
- Low-VOC paints and sealants
- Solvent-free cleaning
- NEA-registered pest control
- Performance
- Keep the Green Mark rating
Green leases are voluntary; clauses range from aspirations to binding duties.
- Market practice Advising a tenant: Read green clauses like any other covenant: are they "best efforts" or binding, who pays for meters and fit-out standards, and what data must be shared?
Commercial property: players, strata and pricing
Syllabus 3.11.1Syllabus 3.11.2Syllabus 3.11.3
- Market practice Players: Developers, REITs and funds, owner-occupiers, investors in strata units, tenants (from anchor tenants to small shops), managing agents and MCSTs. REITs are large landlords of malls, offices and industrial space.
- REIT rules: Since 28 Nov 2024 every REIT has a single 50% leverage limit and must keep an interest coverage ratio of at least 1.5 times. A REIT is not taxed at trust level on income it distributes if it pays out at least 90% of its taxable income.
- Who runs a REIT: The trustee holds the REIT's properties for the unitholders. The REIT manager sets strategy, including buying and selling properties, for a base fee plus a performance fee. The property manager handles leasing, marketing and upkeep, paid from the REIT's assets. The sponsor supplied the first properties and holds stakes in the REIT and its manager. Unitholders receive distributions and can remove the REIT manager.
Parties: Unitholders (the investors); Trustee (holds the properties); REIT manager (sets strategy); Property manager (runs the buildings).
- Trustee to Unitholders: Trustee for unitholders
- holds the assets on their behalf
- paid a trustee fee
- REIT manager to Unitholders: Manager for unitholders
- buys and sells properties
- base fee plus performance fee
- unitholders can remove it
- Property manager to Trustee: Property manager and the REIT's properties
- leasing, marketing, upkeep
- paid from the REIT's assets
The sponsor supplied the first properties and holds stakes in the REIT and its manager.
- Strata or whole building: Establish first whether you are selling a strata unit (its own strata title, MCST, by-laws and share value) or a whole building. From 15 Mar 2022 the commercial part of developments along the Orchard Road and CBD corridors and near national landmarks cannot be split into strata units, though different uses can still be separate strata lots.
- Uncompleted commercial: Developers selling uncompleted commercial units follow the Sale of Commercial Properties Act: a prescribed option and S&P with progressive payments, and a booking fee of at most 10%. It does not apply to a building of 4 or fewer units.
- Market practice Tenure: Commercial land is often 99-year leasehold; older sites may be freehold or 999-year. Remaining lease affects financing and price.
| Factor | Why it matters |
|---|---|
| Tenure and remaining lease | shorter leases depreciate and are harder to finance |
| Accessibility and frontage | visibility, foot traffic, MRT access and parking |
| Size and shape | a regular, efficient layout lets more easily |
| Facilities | lifts and escalators, loading, air-conditioning hours, security |
| Approved use | a unit approved for F&B or a school is worth more to those tenants |
| Tenant mix and anchor | a strong anchor tenant draws traffic to the other units |
Offices, shops, F&B, schools and childcare
Syllabus 3.11.4Syllabus 3.11.7Syllabus 3.11.9
- Approved use first: A commercial unit may only be marketed for its approved use: no "office-cum-residence", no marketing an industrial unit as an office. Check approved use on URA SPACE.
Can this unit be used for that?
- Shop, showroom, restaurant
- Switch between them — no planning permission
- Not: Restaurant as a bar
- Childcare centre
- Under 50% of GFA — no planning permission
- Not: In a shophouse
- Licence first
- Commercial school
- Instant approval — may qualify by lodgement
- Not: As a home office
- Religious use
- Approved venues only — function halls, cinemas
- Up to 2 days a week
- Lower of 20% of GFA or 20,000 sqm
- F&B
- Restaurant use
- Food licence
- Change or intensify use: A new use outside the authorised list needs a change-of-use application ($500, about 10 working days on GoBusiness) and may attract a Land Betterment Charge. The landlord's consent (under the lease) and, in a strata development, the MCST's by-laws must also allow it.
- Worked example: A childcare operator wants space in a 30,000 sqm shopping centre. No planning permission is needed as long as the childcare space in the centre stays under 15,000 sqm (50% of its GFA), the centre has no special use condition, and the operator is licensed before opening.
- Market practice Special considerations: Parking and loading for the use, lift and escalator capacity, security, the anchor tenant and the overall trade mix all matter to a commercial tenant. Ask what licences the business needs before signing.
- Hotels: At least 60% of a hotel must be hotel rooms and related uses, commercial at most 40%, and only the commercial part may be strata subdivided. Hotels are not restricted for foreign buyers under the Residential Property Act.
Selling a commercial or industrial property: the method and the marketing plan
Syllabus 3.11.5Syllabus 3.11.6Syllabus 3.12.5Syllabus 3.12.6
- Start with what is being sold: A strata shop or office unit (its own title, MCST and by-laws) or a whole building? On the Orchard Road and CBD corridors and near national landmarks, the commercial part of a development cannot be strata subdivided, so it cannot be sold off unit by unit. Read the methods of sale first.
- Start: An owner of a shop, office or factory wants to sell
- Question: Is a lender or the Sheriff selling? (a repossessed or seized property)
- No: go to the next step
- Yes: Usually public auction
- Question: A whole building or site that several investors want? (large, unusual or hard to price)
- No: go to the next step
- Yes: Tender or expression of interest
- End: Private treaty, negotiated through agents
- Whatever the method: Pass every offer and expression of interest to the client, and act for one side only.
Who buys this, and why?
- Product
- Approved use and zoning
- Tenure and remaining lease
- Existing tenancies and rents
- Price
- Comparable transactions
- Yield — state its basis and source
- Expected price or range
- Place
- Investor and business networks
- Co-broking agents
- Signs, with consent
- Promotion
- Specification sheet
- Verified rents, with period
- Required ad particulars
- The proposal comes first: Before advertising, show the seller a marketing proposal with a range of comparable transacted prices or rents, current asking prices and an overview of the market, and get his written consent. Advertise only at the price and on the terms he instructed.
- Investor buyers: Commercial buyers often buy for income. If an ad states a yield or return, give its basis, a credible source and the period of any past data. Market the approved use only: never an office as a home, or an industrial unit as an office.
- Industrial listings: The same choice of method applies to factories and warehouses. Lead with what an industrialist checks: the zoning (B1 or B2) and approved use, the 60:40 split between industrial and ancillary space, floor loading, loading bays and power supply. For a JTC whole-lot lease, the buyer and its activity need JTC's approval before the lease can be assigned.
- Market practice Worked case: A family owns a whole office building let to several tenants, and three funds have asked about it: a tender or expression of interest lets them compete on price and terms by one closing date. A single strata shop unit in a busy estate is normally sold by private treaty.
Commercial and industrial leases: the key terms
Syllabus 3.11.8Syllabus 3.12.8
What does this lease say?
- What the tenant pays
- Rent — fixed, or base plus GTO
- Security deposit — retail: capped at 3 months' gross rent
- Service charge — common areas; how it can rise
- How long, and how it ends
- Term and renewal — retail leases of 1 year or more: the Code
- Fit-out period — often rent-free
- Pre-termination — who may end early
- Who may do what
- Sublease and assignment — JTC: at most 30% to unrelated firms
- Insurance — building, fit-out, public liability
- Reinstatement — agree the standard at the start
- GTO rent for stamp duty: If the GTO part has a maximum secured sum, the dutiable extra rent is that maximum; if it has a minimum, it is the higher of the estimate and the minimum.
- Worked example: A 3-year lease of a 1,200 sq ft mall shop at $8,000 gross rent a month: the deposit is capped at $24,000 unless both sides file a joint declaration of deviation with FTIC within 14 days of signing.
The retail leasing Code of Conduct (FTIC)
Syllabus 3.11.11Syllabus 3.11.12Syllabus 3.11.13
- Aims and coverage: The Code of Conduct for Leasing of Retail Premises sets mandatory guidelines for fair, balanced lease negotiations, a framework to ensure compliance and an accessible way to resolve disputes. Compliance has been mandatory since 1 Feb 2024 for qualifying retail leases of 1 year or more, under the Lease Agreements for Retail Premises Act 2023. Retail premises are premises used to sell goods or supply services. The Fair Tenancy Industry Committee (FTIC), formed on 3 May 2021, is its custodian.
The retail leasing Code
- How to negotiate
- Good faith
- No exploiting known ignorance
- Leasing principles
- 11 key terms — e.g. exclusivity, sales performance, pre-termination
- Data and confidentiality
- Sales data by trade — before signing; twice a year to GTO tenants
- Disputes
- Resolution and enforcement
- The checklist and deviations: Every retail lease must come with a checklist of the Code's clauses, and the landlord must flag any clause that departs from the Code. Four clauses may be deviated from by mutual agreement (exclusivity, sales performance, security deposit and rental formula), and a joint declaration of the deviation must be filed with FTIC within 14 days of signing; the $100 fee is shared.
- Deposit cap: Security deposits are capped at 3 months' gross rent for units of up to 5,000 sq ft on leases of up to 3 years; deposits of $500 or less are exempt from the cap.
- Start: A Code problem
- Question: Lease signed yet?
- Yes: go to the next step
- No: Report to FTIC — it collates and monitors cases
- File the dispute — within 14 days
- Question: Settled at mediation? (Singapore Mediation Centre)
- No: go to the next step
- Yes: Settled — record the agreement
- End: Adjudication — enforceable as a court order
Industrial property: zoning, use quantum and facilities
Syllabus 3.12.1Syllabus 3.12.2Syllabus 3.12.3Syllabus 3.12.4
- Players: JTC (the main industrial landlord), private developers and owners, industrial REITs, owner-occupier manufacturers and logistics firms, and tenants. Industrial land is leasehold, usually 20 or 30 years on JTC and Industrial GLS sites; Industrial GLS sites launched from 6 Mar 2025 get 3 extra years.
- NEA nuisance buffer
- Business 1: 50 m
- Business 2: 100 m
- Business Park: no pollutive uses
- Use quantum
- Business 1: at least 60% industrial
- Business 2: at least 60% industrial
- Business Park: at least 85% BP; up to 15% White
- Where the 60:40 applies
- Business 1: whole development and each strata unit
- Business 2: whole development and each strata unit
- Business Park: inside the BP part
- Religious use
- Business 1: limited, with conditions
- Business 2: never
- Business Park: never
- 60:40 per unit: For both B1 and B2, at least 60% of the industrial GFA must be industrial and at most 40% ancillary. In a strata industrial development the split applies to the whole development and inside each strata unit, so an owner cannot turn most of his unit into an office. The same applies on B1-White sites. A single-user building cannot be strata subdivided.
- Minimum unit size: An industrial unit must be at least 150 sqm, to stay usable for industry.
| Property | Rule | Result |
|---|---|---|
| 2,000 sqm B1 strata factory unit | at least 60% industrial | at least 1,200 sqm industrial; office up to 800 sqm |
| JTC lessee with 5,000 sqm GFA | sublet up to 30% to unrelated firms | up to 1,500 sqm |
| 10,000 sqm business park | 85% BP (60:40 inside it), 15% White | 8,500 sqm BP, of which at least 5,100 sqm predominant and at most 3,400 sqm ancillary; 1,500 sqm White |
| 20,000 sqm hotel | at least 60% hotel | at least 12,000 sqm hotel; up to 8,000 sqm commercial |
- NEA approval: NEA classes industries as clean, light, general or special and applies buffer distances to homes to limit smell, dust and noise. An owner or tenant can ask NEA through an Industrial Siting Consultation whether a use suits the premises.
| Factor | Why it matters |
|---|---|
| Remaining lease | industrial leases are short (often 20 or 30 years), so value falls faster |
| B1 or B2 | B2 suits heavier users; B1 allows limited religious use |
| Loading, goods lifts and ramp-up access | logistics and manufacturers need them |
| Floor loading and ceiling height | decide which machines and racking fit |
| Unit size and layout | at least 150 sqm; regular shapes let better |
- Marketing: Industrial units must not be marketed for office use.
JTC property: subletting, assignment and religious use
Syllabus 3.12.7Syllabus 3.12.9
- Subletting: JTC land lessees may sublet up to 30% of GFA to unrelated parties; subletting to related businesses (more than 50% owned) is outside the cap. Tenants of JTC high-rise or workshop premises may not sublet to unrelated parties.
Parties: JTC (the landlord); Land lessee (the industrialist); Related firm (more than 50% owned); Unrelated firm.
- JTC to Land lessee: JTC and its lessee
- approves any sale of a whole-lot lease, and the buyer's activity
- consents to a change of use
- Land lessee to Related firm: Subletting to a related firm
- outside the 30% cap
- Land lessee to Unrelated firm: Subletting to an unrelated firm
- at most 30% of GFA
Tenants of JTC high-rise or workshop premises may not sublet to unrelated parties.
- Selling a JTC lease: Assigning (selling) a whole-lot JTC lease needs JTC's prior approval of the buyer and its industrial activity, so the sale is conditional on that approval.
- Religious use: In JTC B1 landed premises a tenant needs a JTC no-objection letter and separate URA approval, up to 2 days a week, for up to 3 years or the rest of the tenancy, whichever is shorter. It must fit within the 40% ancillary space, and the premises cannot be leased exclusively to or owned by the religious group.
- Market practice Landlord consent: Any change or intensification of use needs the landlord's (JTC's or the owner's) consent under the lease, as well as URA permission where required.
Unauthorised use of commercial and industrial premises
Syllabus 3.11.10Syllabus 3.12.10
- The offence: Using premises for something other than the approved use, or carrying out works, without planning permission is development without permission: a fine of up to $200,000, plus $10,000 a day while it continues; repeat offenders also face up to 12 months' jail.
- Development or change of use without permission repeat: also up to 12 months' jail
- Each day the unauthorised use continues
Steps are in order, not to scale.
The lease can also be terminated, and JTC can refuse an assignment, if the use breaches its terms.
Show as a table
| Value | Note | |
|---|---|---|
| Each day the unauthorised use continues | $10,000 | |
| Development or change of use without permission | $200,000 | repeat: also up to 12 months' jail |
- Market practice Typical cases: An office used as a home; a B2 factory used for worship; an industrial unit run mainly as a showroom office; a shop turned into a tuition centre without approval. Warn clients before they sign, not after.
Conservation: why, where and the 3R principle
Syllabus 3.13.1Syllabus 3.13.2Syllabus 3.13.5
- Why conserve: URA conserves buildings and areas that tell Singapore's history and give its streets their character. Owners keep using them, but changes must respect the original building.
Which kind of conservation area?
- Historic Districts
- Boat Quay
- Chinatown
- Kampong Glam
- Little India
- Residential Historic Districts
- Blair Plain
- Cairnhill
- Emerald Hill
- Secondary Settlements
- Joo Chiat, Tiong Bahru
- Geylang, Jalan Besar
- River Valley and others
- Bungalows
- Including 'black and white' bungalows
- The 3R principle: Maximum Retention, sensitive Restoration and careful Repair. Original structural and architectural elements are kept and restored; total reconstruction is avoided. Where something must be replaced, it is replaced one for one in the original design and material, with URA's clearance.
- Specific Restoration Guidelines: Owners can ask URA for Specific Restoration Guidelines for their own building, which say exactly which elements must be kept.
- Black and white bungalows: A bungalow with a distinctive colour scheme, such as black and white, must keep it. Murals are generally not allowed, and air-conditioning units must be out of sight from the road.
Conservation: uses, extensions and approvals
Syllabus 3.13.4Syllabus 3.13.6Syllabus 3.13.1
- Permission for everything: URA Conservation Permission is needed before any works and before a new use starts in a conserved building, whether or not BCA approval is also needed. After Conservation Permission, building plans for Category 1 and 2 works must be cleared by BCA before work starts.
From Key elements to Minor or repair:
- Category 1: roof, facade, structure, rear extension (for example: architect submits; then BCA plans)
- Category 2: other changes to key elements (for example: architect or engineer; then BCA plans)
- Category 3: canopy, awning, business signs (for example: no professional needed; free; about two weeks)
Every category needs Conservation Permission before work starts.
| Not allowed | Also not allowed in the Historic District Core Areas |
|---|---|
| new bars, pubs, nightclubs and karaoke lounges | western fast-food restaurants |
| new massage establishments and spas | supermarkets |
| amusement centres; motor vehicle showrooms | building-material showrooms; nursing homes |
| warehouse stores (unless ancillary); places of worship (unless authorised) | offices on the 1st storey (banks excepted) |
| pollutive trades: welding, spray-painting, motor workshops | the 1st storey must hold activity-generating uses such as shops |
- Change of use: A business must get conservation permission before it starts operating in a Historic Conservation Area. Apply through GoBusiness: $500, about 10 working days. The quick Change of Use Lodgement Scheme does not apply to conserved buildings there.
- Rear extensions: In Residential Historic Districts a rear extension must be lower than the main roof and no more than 3 storeys. In Secondary Settlements an owner may conserve the whole shophouse or the main building with a new rear extension, whose height depends on the area.
- Roof structures: On the flat roof of a fully conserved building, a new single-storey structure up to 3,600 mm high may be added within a 35% coverage allowance. On a 60 sqm roof that is at most 21 sqm.
- Awnings, canopies and projections: Adding or removing a tiled canopy or retractable awning is Category 3 work, still needing permission. Roof eaves, canopies or other projections beyond the site boundary also need the consent of the relevant parties, and on State land an unauthorised awning can be an encroachment.
- Strata subdivision: Conserved shophouses in Secondary Settlements may be strata subdivided, but the 1st storey must stay in one ownership.
Conservation shophouses: pros, cons and marketing
- Character
- Advantages: heritage facade, scarce supply
- Disadvantages: facade and key elements fixed
- Use
- Advantages: shops, F&B, offices; some other uses may be approved
- Disadvantages: many trades banned; permission first
- Works
- Advantages: rear extensions and roof structures, within limits
- Disadvantages: permission for every work; costly restoration
- Foreign buyers
- Advantages: commercial use: no RPA approval
- Disadvantages: non-commercial use: restricted
- Market practice Marketing checklist: Before you list: confirm the conservation group and any core-area rules, the zoning and allowable uses on URA SPACE, any Specific Restoration Guidelines, what extension height applies, and whether past works were approved. A buyer's business plan must match the allowed uses.
Penalties for unauthorised works on conserved buildings
- The rule: Works in a conservation area without conservation permission are an offence like development without permission. Demolishing a conserved building carries the heaviest penalty.
- Demolishing a conserved building and/or 12 months' jail
- Works without conservation permission repeat: also up to 12 months
- Each day the offence continues
Steps are in order, not to scale.
Show as a table
| Value | Note | |
|---|---|---|
| Each day the offence continues | $10,000 | |
| Works without conservation permission | $200,000 | repeat: also up to 12 months |
| Demolishing a conserved building | $500,000 | and/or 12 months' jail |
- Market practice In practice: URA can also require unauthorised alterations to be reversed and the original profile reinstated, so a buyer can inherit the cost of a seller's illegal works. Ask for the approvals for any past changes.
Check yourself
Answer yes or no, then tap to see if you were right.
Can a church meet in a B2 factory on Sundays?
Show answer
No. Religious use is allowed only in B1 premises.
Is a B2 zone's nuisance buffer 100 m?
Show answer
Yes. NEA requires 100 m for B2 and 50 m for B1.
May a JTC lessee sublet half its space to an unrelated firm?
Show answer
No. The cap is 30% of GFA for unrelated parties.
Does replacing a shophouse awning in a conservation area need URA permission?
Show answer
Yes. All works need Conservation Permission, though Category 3 works are simple and free.
Must an agreed deviation from the retail Code's deposit cap be declared to FTIC within 14 days of signing?
Show answer
Yes. Both parties file a joint declaration.
Can a new bar open in the Chinatown conservation area?
Show answer
No. New bars, pubs and nightclubs are not allowed in Historic Conservation Areas.
Is a Super Low Energy building at least 60% better than 2005 levels?
Show answer
Yes. GM Platinum needs 55%; the legal minimum is 40%.
A 2,000 sqm B1 strata unit: can half of it be office?
Show answer
No. Ancillary use is capped at 40%, so at most 800 sqm.
Can a rear extension in Emerald Hill be 4 storeys?
Show answer
No. In Residential Historic Districts it must be lower than the main roof and at most 3 storeys.
Outcomes covered
The 2027 syllabus outcomes for this chapter’s topics (3.9, 3.11, 3.12, 3.13), and the section that covers each: 33 of 33 here. Full syllabus index
- 3.9.1Explain the aims of BCA's Green Mark rating scheme for new and existing buildings.Green buildings and BCA Green Mark
- 3.9.2Describe Green Mark criteria and the benefits of certified features to buyers/tenants.Green buildings and BCA Green Mark
- 3.9.3Describe typical green-lease clauses on energy, water, materials, waste, indoor environment and occupant well-being.Green leases
- 3.11.1Identify and describe players in the commercial property market.Commercial property: players, strata and pricing
- 3.11.2Establish occupation type and tenure (strata or not) of a commercial property before marketing.Commercial property: players, strata and pricing
- 3.11.3Identify pricing factors for strata commercial units: tenure, access, size, shape, facilities.Commercial property: players, strata and pricing
- 3.11.4Identify special considerations for offices, retail, schools, childcare, tuition centres, showrooms and F&B, incl. parking, anchor tenant, trade mix, licensing and NEA approval.Offices, shops, F&B, schools and childcare
- 3.11.5Choose the most suitable sale method for a commercial property.Selling a commercial or industrial property: the method and the marketing plan
- 3.11.6Design a marketing mix/promotional plan for a commercial listing.Selling a commercial or industrial property: the method and the marketing plan
- 3.11.7Comply with URA, HDB and other rules when marketing commercial property.Offices, shops, F&B, schools and childcare
- 3.11.8Explain common commercial lease terms: term, rent, deposits, service charge, sublease, insurance, fitting-out, reinstatement, rent-free period.Commercial and industrial leases: the key terms
- 3.11.9Explain approved use and the need for landlord consent to change or intensify use (commercial).Offices, shops, F&B, schools and childcare
- 3.11.10Explain penalties for illegal or unauthorised use of commercial premises.Unauthorised use of commercial and industrial premises
- 3.11.11Explain the aims of the FTIC Code of Conduct for Leasing of Retail Premises and which premises it covers.The retail leasing Code of Conduct (FTIC)
- 3.11.12Explain CoC principles (negotiation conduct, key terms, data transparency, disputes, enforcement) and use of the CoC clause checklist and joint declaration of deviations.The retail leasing Code of Conduct (FTIC)
- 3.11.13Explain dispute routes for CoC breaches: FTIC pre-contract; Singapore Mediation Centre within 14 days post-signing.The retail leasing Code of Conduct (FTIC)
- 3.12.1Identify and describe players in the industrial property market.Industrial property: zoning, use quantum and facilities
- 3.12.2Establish occupation type and tenure of industrial property.Industrial property: zoning, use quantum and facilities
- 3.12.3Identify pricing factors for strata industrial units.Industrial property: zoning, use quantum and facilities
- 3.12.4Apply industrial-specific considerations: loading bays, goods lifts, access, B1/B2/white zoning, predominant vs ancillary use quantum, NEA approval.Industrial property: zoning, use quantum and facilities
- 3.12.5Choose the most suitable sale method for an industrial property.Selling a commercial or industrial property: the method and the marketing plan
- 3.12.6Design a marketing mix/promotional plan for an industrial listing.Selling a commercial or industrial property: the method and the marketing plan
- 3.12.7Explain JTC policies and usage rules for marketing JTC industrial property.JTC property: subletting, assignment and religious use
- 3.12.8Explain common industrial lease terms: term, rent, deposits, service charge, sublease, insurance, fitting-out, reinstatement, rent-free period.Commercial and industrial leases: the key terms
- 3.12.9Explain approved use and landlord consent for change/intensification of use (industrial).JTC property: subletting, assignment and religious use
- 3.12.10Advise on penalties for illegal or unauthorised use of industrial premises.Unauthorised use of commercial and industrial premises
- 3.13.1Describe URA conservation guidelines, aims of conservation and the categories of areas (historic districts, residential historic districts, secondary settlements, bungalows) and their extension rules.Conservation: why, where and the 3R principle, Conservation: uses, extensions and approvals
- 3.13.2List conservation property types: shophouses, black-and-white bungalows, warehouses, institutional buildings.Conservation: why, where and the 3R principle
- 3.13.3Weigh pros and cons of conservation shophouses and key marketing factors.Conservation shophouses: pros, cons and marketing
- 3.13.4Describe permitted uses in conservation areas and approvals for A&A works (URA conservation permission, BCA plans).Conservation: uses, extensions and approvals
- 3.13.5Explain the '3R' conservation principles: maximum retention, sensitive restoration, careful repair.Conservation: why, where and the 3R principle
- 3.13.6Describe rules and approving agencies for structures like awnings, gazebos and pools on conserved properties.Conservation: uses, extensions and approvals
- 3.13.7Explain penalties for unauthorised alterations to conserved properties.Penalties for unauthorised works on conserved buildings
Practise and read on
Topic practice
Worked questions
Sources
Figures checked against official sources. Each note is tied to an entry in our fact registry, and these are the official pages behind them:
- BCA
- BCA: Quality mark
- CEA
- CEA Professional Service Manual: Practice Guidelines Professional Service Manual
- CEA RES Examination Syllabus 2027 v1.0: RES examination Syllabus 2027
- CEA: PG 02 11 Practice Guidelines on Ethical Advertising
- IRAS: E taxguide income tax treatment of reits and approved sub trusts
- IRAS: Renting a property
- JTC
- JTC: Non exclusive and limited religious use in industrial premises
- JTC: Subletting your premises
- MAS: Mas rationalises leverage requirements and introduces additional disclosures for reits
- MoneySense: Understanding real estate investment trusts reits
- MTI
- MTI: Introduction of the lease agreements for retail premises bill
- NCCS
- Singapore Courts: Sheriff services immovable property
- Singapore Land Authority: Foreign ownership of property
- Singapore Statutes Online: CLPA1886
- Singapore Statutes Online: EAA2010 S644 2010
- Singapore Statutes Online: LTSA1967
- Singapore Statutes Online: PA1998
- Singapore Statutes Online: SCPA1979
- SLA / MinLaw: New state lands protection bill to replace the state lands encroachments act
- SLA: Demystifying the lbc
- URA
- URA
- URA Conservation Guidelines
- URA Conservation Guidelines: Secondary settlement
- URA Conservation Guidelines: Use of buildings in conservation areas
- URA Development Control Handbook: Use quantum
- URA Development Control Handbook: Use quantum
- URA: Assessment Criteria
- URA: Change Use of Property for Business
- URA: Commercial spaces religious purposes
- URA: Conservation guidelines
- URA: Dc12 07
- URA: Dc22 02
- URA: Goods lift loading bays
- URA: Home office scheme
- URA: MP25WrittenStatement
- URA: Strata Subdivision
- URA: Types Works
- URA: Unit size
- URA: Ura conservation principles
- URA: Use quantum
- URA: Use Quantum
- URA; NEA
A few general principles (for example, how property markets behave) come from established legal and economic texts recorded in the same registry.
These notes are our own plain-English summary for revision. They are not course material or past exam questions. If anything here differs from CEA, IRAS, MAS, HDB, URA, SLA or the law itself, theirs is the rule.